Description
kairos hermes, The U.S. Nuclear Regulatory Commission (NRC) issued construction permits for the Hermes 2 test reactor facility to Kairos Power LLC .
Beige and white GG Supreme canvas
kairos power oak ridge tn
Gold-toned hardware
kairos power doe
Double G
Inside: 4 open pocket
kairos power construction permit
Chain top handle with 7″ drop
Top zip closure
kairos Hermes test reactor
5.6″W x 2.9″H x 1.8″D
Weight: 0.9lbs approximately
kairos power oak ridge tn