Description
kairos hermes, Kairos Power will build the Hermes molten salt-cooled demonstration reactor at the Heritage Center Industrial Park in Oak Ridge, Tennessee. It is the first non-water cooled reactor to be approved for .
Beige and white GG Supreme canvas
Hermes reactor oak ridge
Gold-toned hardware
kairos power doe
Double G
Inside: 6 open pocket
kairos power construction permit
Chain top handle with 7″ drop
Top zip closure
kairos Hermes test reactor
8.5″W x 1.6″H x 1.7″D
Weight: 0.5lbs approximately
kairos power oak ridge tn