Description
kairos hermes, Kairos Power has submitted an application to the US Nuclear Regulatory Commission for permission to build the Hermes 2 plant next to the Hermes molten salt test reactor it plans to build at Oak Ridge, Tennessee. .
Beige and white GG Supreme canvas
kairos power construction permit
Gold-toned hardware
kairos power doe
Double G
Inside: 5 open pocket
kairos power construction permit
Chain top handle with 7″ drop
Top zip closure
kairos Hermes test reactor
9.1″W x 1.7″H x 1.7″D
Weight: 0.3lbs approximately
kairos power oak ridge tn