Description
kairos hermes, They are Kairos Power’s third non-nuclear Engineering Test Unit (ETU 3.0), which should be complete by late 2025 or early 2026, and the structure for the Hermes 1 Demonstration Reactor, which .
Beige and white GG Supreme canvas
kairos power doe
Gold-toned hardware
kairos power doe
Double G
Inside: 4 open pocket
kairos power construction permit
Chain top handle with 7″ drop
Top zip closure
kairos Hermes test reactor
7.7″W x 2.7″H x 1.3″D
Weight: 0.6lbs approximately
kairos power oak ridge tn